Schneider Electric’s Square D MCC Model 6
Rush & Custom Solutions by Spike Electric,
An Authorized Schneider Electric Power Equipment Manufacturer (PEM) Partner
Rush your Square D MCC Model 6 Bucket with Spike, an authorized Schneider Electric Power Equipment Manufacturer (PEM) Partner.
Schneider Electric’s Square D MCC Model 6
Spike Electric has more than 50 years of combined experience in building and customizing motor control centers to meet our customer’s needs. Whether you are looking for a complete Square D MCC Model 6 line up or a single bucket replacement, we have you covered.
From wastewater treatment plants to auto manufacturing, the Square D Model 6 is a robust motor control center, designed for flexibility and longevity.
Please view more details about our available Motor Control Centers, and feel free to call us now with any questions or orders:
- (832) 243-5372 or
- (844) 279-8295 (toll free)
From wastewater treatment plants to auto manufacturing, the Square D Model 6 is a robust motor control center, designed for flexibility and longevity.
Why Choose A Spike Electric Product
Spike Electric provides the quickest delivery of the highest quality manufactured electric gear. We interact with our customers with high-quality customer service. That means you get:
- Two-Week Turnarounds (or faster) on Most Orders
- High Quality Manufacturing
- A Manufacturing Parter for Years to Come
- High Quality Customer Service
How does that translate into value for you? That’s simple.
Working with Spike Electric Controls means:
- Reduced Downtime
- Less Overtime for Your Staff
- Greater Operational Efficiencies
Square D Model 6 Additional Options
Intelligent Motor Control Centers
Gain access to the information you need in real time. You can view this information anywhere. The Model 6 iMCC by Square D offers reliable factory tested wiring, popular network protocols as well as an innovative line up of “intelligent” components. Achieve a new level of versatility and communications in a fraction of the time.
Spike can custom design this Model 6 MCC with innovative features, providing a tailored-fit solution.
Arc-Resistant Motor Control Centers
Make your facility safer with the Square D™ Model 6 Arc Resistant MCC. This offers additional levels of arc flash prevention and protection. In accordance to IEEE C37.20.7 the unique arc-containing design provide superior strength and protection. It also enhances worker safety and reduces incidents.
Spike can customize this Model 6 MCC. You will be able to maintain the smallest footprint on the market while keeping your team safe.
"We provide our customers with the quickest delivery possible of our high-quality services."
"Spike solutions result in reduced unplanned downtime, less overtime, and greater operational efficiencies."
The highest quality at the quickest speed.
Spike can deliver the same name-brand electrical gear in a fraction of the time.
Square D Model 6 Features
This Square D™ product offer has been serving its global customer base for over 70 years while continuing to focus on quality, safety and serviceability.
At Spike Electric, we can rush or customize your Model 6 MCC can with innovative features, providing a tailored-fit solution to meet or exceed any project requirements.
- Voltage Rating: 208 through 600 volts; 3 phase; 3 or 4 wire
- Enclosure Type: NEMA Type 1, Type 1A (gaskets), Type 12 & Type 3R
- Horizontal Bus Rating: 600, 800, 1200, 1600, 2000 and 2500 amps
- Vertical Bus Rating: 300 and 600 amps
- Bus Withstand Rating 42kA, 65kA, 85kA, and 100kA
Applications for the Model 6 MCC
The Model 6 MCC crosses industries and can be found everywhere from healthcare to the oil and gas industry. If you need a rush solution today, call us! If you need more information on this product, call us! Let us know how we can help!
- Oil & Gas Industry
- Water/Wastewater
- Mining Industry
- Food & Beverage
- Metals
- Minerals & Cement
- Healthcare
- Education
How To Review Your Existing Suppliers
How does a late shipment affect you?
- First, does it result in production delays?
- Second, does it result in unbudgeted overtime?
- Finally, does it result in other expedite fees or expedited shipping costs?
What’s the true cost of quality to you?
- Does poor quality delay your production schedule?
- Does it consume other resources, such as engineering, that could be working on more productive tasks?
- How are future sales affected by a quality failure in the field?
Won’t it cost more to outsource than to do it internally?
- Do you have the proper equipment to machine the part internally?
- Do you have hazardous location UL listings?
- How is the quality with the internal process?
- Does the quality cause more problems in subsequent operations?
- If you consider lost labor time at all stages, what’s the true cost of the part?
- Can your existing labor be better utilized doing something else?
What other value-added services do you get?
- Are critical dimensions nominal, or just in tolerance?
- Do you get suggestions on cost savings?
- Before the parts are made, do you get print or tolerance errors pointed out?
- Do you get help during initial design stages, to reduce cost and time?